Product installation guide - mechanical crusher
1.
preparation tools
Prepare a wrench, an iron rod (an auxiliary
installation), a cleaning agent, a hammer, and other tools
2. take the U type mounting plate
Remove all pin shafts on the mechanical
clamp, and take down the U type mounting plate and the related bolts.
3. pin shaft pin shaft
The operating excavator
reacts the shaft hole of the bucket and the crushing clamp, inserts the pin
shaft and tightens the fixed bolt. (due to unevenness of the ground lead to the
use of an iron hammer to insert the pin shaft when the installation is not
smooth)
4. Connecting rod pin shaft
The elongated bucket oil
cylinder coincides with the shaft hole of the connecting rod and the crusher,
inserts the pin shaft and tightens the fixed bolt.(due to unevenness of the
ground lead to the use of an iron hammer to insert the pin shaft when the
installation is not smooth)
5. installation of U type mounting plate
The rear end of the
bucket is installed with the pin of the pin shaft to make the tail of the
crusher close to the bottom of the bucket.Adjust the bottom contact plate to
keep it close to the bottom of the bucket
Insert the U type
mounting plate and adjust the mounting plate to close it to the top of the
bucket rod of the excavator.Adjust the bolts above the U plate to ensure the
consistency of the left and right fasteners.
Adjust the bolts below the U plate to ensure
the consistency of the left and right fasteners.
Finally, make sure that all the bolts are
tightened.
6. Try
to run and check if there is any interference
Before the test run,
check again whether the U type mounting plate is close to the bucket or not,
otherwise it is easily damaged by unequal force.The maximum elongation and the
contraction bucket oil cylinder check whether the U type mounting plate
interfered with the body or the cylinder.
If there is any interference, please let us know
how to deal with it.
2018 01/26